neuroBLDR Tools

Manpower Projector

See every crew across every job, week by week — before you're short.

  • A loading curve per job — bell, flat, front- or back-loaded — with start week, duration and peak crew.
  • Your bench as a line across the stack; every week you're over capacity is flagged in red.
  • Peak week, crew-weeks and bench utilization computed live as you type.
  • A plain-English insight line that names the pinch week and the shortfall.
  • Print to a one-pager for the Monday meeting; export/import your data as JSON.
Accent

Instant download after payment. Stripe handles the card; we never see it.

What it computes

bench 36W1W11W20

Peak week is W11 at 28 of 36 — the example clears it.

This preview is rendered by the same math that ships in the file, on the example jobs the tool loads first — not a mockup.

The rest of the kit

All three together are $99— and three singles automatically resolve to the pack price, so there's no wrong order to buy in.